01 October 2026
AE_202609_Project Registration Programme.jpg
AE-202610-EGO Display EasyRENT Plus-.jpg 01 October 2026

EasyRENT Plus+ P3.9‑O‑100 is the 500 × 1000 mm outdoor LED panel designed for rental applications that require high brightness, fast setup, and maximum reliability. The die-cast aluminum cabine...

AE-202609-EGO Display Iridah.jpg 29 September 2026

EGO Display Iridah‑1.9 is an indoor P1.9 LED panel measuring 500 × 500 mm designed for rental applications that require robustness, modularity, quick maintenance, and superior visual quality. Thank...

AE-202609-EGO Display EasyNATURAL.jpg 24 September 2026

EGO Display EasyNATURAL represents a new generation of decorative high-end indoor LED walls, in which COB (Chip on Board) flip-chip high-definition technology blends with surfaces that reproduce wo...